USP (Unique selling Proposition) of Biodiesel Processing Plants manufactured by Eastern Biodiesel Technologies Pvt. Ltd/Biodiesel Technologies, Kolkata
- Multi-Feedstock Biodiesel Processors
- Modular Batch Transesterifier - Expandable
- Latest Adsorbent Technology Compliant-Chemical Purification System, Water Less Process.
- Indigenously Developed, Low Cost
- High Energy Effectiveness
- Minimum Manpower requirement
- Optimum oil to Biodiesel Conversion
- Final Product- BIODIESEL-International Standard Compliant (EN-14214, ASTM D-6751, BIS)
- Suitable for all diesel engines without modifications
- Equipped with Methanol Recovery System
- Zero waste production process
- Zero effluents-Non Polluting Plants
- Low Temperature and low Pressure process
- High safety Levels
- Low electricity consumption
- Centralized Control Panel with video screen
- Low Footsteps
License Required
To start up any industry, any new venture, there is a long list of licenses and approvals that are required from various government bodies and regulatory associations. However to set up a Biodiesel Processing Plant, one doesn't have to bother about such things. The Biodiesel Processing Plants manufactured by us requires hardly three licenses. All the below mentioned licenses are easy to get.
Factory Licenses: For setting up of any Factory, one needs to take an approval from the District factory Inspectorate.
Explosive License: For storage of Methanol, one has to obtain an Explosive License from the Directorate of Explosive. For Biodiesel, this license is issued form Nagpur.
Pollution Control Board Clearance: Since our Multi-feedstock Biodiesel Processing Plants are non-polluting, hence the same can be obtained easily.
Frequently Asked Questions (FAQ'S):
The basic requirement for setting up the plant that you require is Land. Now the question that comes to your mind as to how much land will be required for setting up the Plant. It is directly related to the capacity of the plant that you put up.
However it is imperative that we provide you with the following details that will provide you a basic layout of the things that are required for setting up the plant:
1. |
Requirement of land |
Ranges from 5 Acres |
2. |
Factory Shed |
15,000 Sq. Feet |
3. |
Electrical |
440V/250KVA |
4. |
Water Supply |
24 hours piped water supply with O/H storage 20,000 Litres |
5. |
Stand By Power |
150 KVA Genset |
6. |
Analytical Laboratory |
Basic module will be set up by us |
7. |
Set of storage Tanks |
Will be dependent on the capacity of the Processing Plant |
8. |
Biodiesel Processor Unit |
Modular batch Transesterifier BDT5 MTPD to 500 MTPD is capable of handling MULTI FEEDSTOCK |
9. |
The Plant supplied is also capable of handling Acid Oil with high FFA upto 60%-90% in an Esterification and Transesterification Process. Animal Fat with high FFA upto 5% is also successfully handled by the Plant. |
Plant set up procedures
At Eastern Biodiesel Technologies Pvt. Ltd/Biodiesel Technologies, Kolkata following is a step by step procedure of how to proceed with the concept of understanding the biodiesel processing plant to the stage of setting up the plant and commissioning the plant.
Here is a Step by Step Procedure that will help you to understand and to proceed with setting up the plant:
STEP 1: Detailed discussion with the Team of Eastern Biodiesel Technologies Pvt. Ltd after having gone through the General offer Letter, Quotation, and Commercial Feasibility.
STEP 2: Signing of the Agreement:
At Eastern Biodiesel Technologies Pvt. Ltd, we use a very Transparent Method of following Agreement. Once the customer decides to go ahead with the project and places us the final order, we sign an agreement disclosing all the details of how the project will be carried on. This agreement includes the following:
- Warranties and Liabilities
- Scope of work
- Technical Specification (Specification and scope of supply, Description of equipment used)
- Project implementation schedule
- Commercial: It includes Price summary, Terms of Payment for the supply of the Plant, Delivery Details, Validity, Reservation
- After Sales service.
After the agreement is duly signed by both the Parties at our Kolkata Office, we proceed with manufacturing the Biodiesel Processing Plant.
STEP 3: Placing the Order
Once the agreement is duly signed by both the parties, and modalities are sorted out. The customer has to pay us advance money in order to go ahead with the project and manufacturing the Processing Plant. (The advance money shall be decided while signing the agreement.)
STEP 4: Once the customer places the order, he can go in for finding Land, building, factory shed, formulating backward and forward integration of feedstock and supply of finished product i.e., Biodiesel etc.
The Plant takes about 6 to 8 months of time to manufacture, and during this 6 to 8 months, the customer can look in to these details of Land, Licenses, Factory Shed etc. So that by the time the customer is done with all the formalities we are also done with the Plant and we can hand you an operational plant without wasting anytime in between.
STEP 5: INSPECTION
Eastern Biodiesel Technologies Pvt. Ltd believes in the policy of absolute transparency and customer satisfaction. We would like that our customer should visit the plant before the delivery and be satisfied with the project.
STEP 6: DELIVERY
Once the plant is ready, and a date has been finalized by the customer, we will dismantle the machine and it will be sent by our low trailers.
STEP 7: INSTALLATION AND COMMISSIONING
Once the plant reaches the customers site and the customer has arranged for feedstock and other requirements, the entire team of Eastern Biodiesel Technologies Pvt. Ltd will visit the Plant site and make the Plant operational by running it for 72 hours and produce Biodiesel complying it with all national and international standard.
STEP 8: AFTER SALES SERVICE
In future if the customer happens to face any problem in the technical running of the plant or requires any kind of help, our team will be there to help you sort out the problem.
|
|
|
|
|
|